SHEAR WALL STRENGTHENING

Duration:

24 Weeks

Project Details

Scope of Work: An 11 storey office block in North London was converted into luxury residential apartments in 2015. CCUK (Fibrwrap) was contracted to design and install CFRP wall strengthening in the central cores for additional loading, door openings through shear walls internally and service risers through concrete slabs.

The Challenge

Adding 2 additional stories to this already high-rise structure in North London gave the structural engineer some real headaches. The three central concrete cores provide the main stability for the structure and adding the extra loads was resulting in some hefty new stresses. In addition, the requirement of openings through floor slabs and shear walls were also required to suit the new layouts for the refurbishment.

The Solution

The first job was to attack the crack repairs, with cracks in both directions all the way through the balconies. It was decided to strengthen across the cracks perpendicular using NSM (near surface mounting) of Tyfo Carbon Fibre Plates. Narrow grooves were cut into the substrate at set centres on both the top and also The whole project consumed over 4000m2 of Fibrwrap Carbon Fibre Wrap Systems, 32 tonnes of steel and over 300 Fibrwrap patented carbon fibre anchors to pass through slabs and staircases between floors. In addition the design called for the strengthening scheme within the cores to be anchored into the foundations, CFRP anchors 1.6m long were drilled and resin fixed into the pile caps.

The Result

This extremely complicated FRP design could only be achieved using Tyfo Fibrwrap Systems, we were very proud to be working on such a large project and believe is still the largest FRP strengthening of a building in the UK to date.

Download our Project Insider
Download Here >
Concrete Surface Preparation for CFRP: Why the Bond Line MattersBlog
September 29, 2026

Concrete Surface Preparation for CFRP: Why the Bond Line Matters

An abrasive blast can leave concrete looking clean without creating a dependable bond. Effective concrete surface preparation for CFRP depends on the...
Advanced Materials in Construction: Properties, Applications and SelectionBlog
September 28, 2026

Advanced Materials in Construction: Properties, Applications and Selection

The most advanced material isn’t automatically the right one for a structure. In advanced materials construction, performance depends on whether the...
Blast Mitigation Strategies: An Engineering Guide to Structural ResilienceBlog
September 25, 2026

Blast Mitigation Strategies: An Engineering Guide to Structural Resilience

Over 80% of injuries sustained during blast events are attributed to secondary fragmentation, particularly glass, which can travel at velocities...