Old Granada Studios
Old Granada Studios

Download our Project Insider to Find Out More

Old Granada Studios

Project Details

Project: Carbon Fibre Strengthening, Concrete Repairs and Protection Works

Contract Duration: 12 Weeks

Scope of Work: CCUK successfully designed and delivered carbon fibre strengthening works to all 9 floors of this exclusive development. Strengthening was carried out around the columns for punching shear along with column strengthening for axial loading and beam strengthening for flexure.

If you would like to request more information, please fill out the contact form.

Challenges in Carbon Fibre Strengthening: What You Need to KnowBlogConcrete Repairs & Specialist Work DivisionConcrete Repairs & Specialist Work DivisionSprayed Concrete ServicesStructural Rehabilitation and Repair
November 19, 2024

Challenges in Carbon Fibre Strengthening: What You Need to Know

Carbon fibre strengthening has become a popular solution in the construction and civil engineering sectors, offering unmatched durability and strength for reinforced structures. Whilst it’s…
The Economics of Carbon Fibre Strengthening: Cost vs. BenefitBlogCarbon Fibre StrengtheningStructural Rehabilitation and RepairStructural Strengthening DivisionSurface Preparations
November 17, 2024

The Economics of Carbon Fibre Strengthening: Cost vs. Benefit

Investing in carbon fibre strengthening for infrastructure and construction projects is a significant decision, especially when considering costs. However, the benefits of this advanced technology…
Sustainable Construction Practices: Building a Greener FutureBlogCarbon Fibre StrengtheningCCUK NewsConcrete Repairs & Specialist Work DivisionStructural Strengthening DivisionSurface Preparations
October 28, 2024

Sustainable Construction Practices: Building a Greener Future

Every business and organisation has a role to play in ensuring sustainability. The increasing demand for greener practices is reshaping the construction industry, pushing companies…