Old Granada Studios
Old Granada Studios

Download our Project Insider to Find Out More

Old Granada Studios

Project Details

Project: Carbon Fibre Strengthening, Concrete Repairs and Protection Works

Contract Duration: 12 Weeks

Scope of Work: CCUK successfully designed and delivered carbon fibre strengthening works to all 9 floors of this exclusive development. Strengthening was carried out around the columns for punching shear along with column strengthening for axial loading and beam strengthening for flexure.

If you would like to request more information, please fill out the contact form.

What Type of Pipeline Rehabilitation Do You Need?BlogCCUK NewsHydrophobic & Hydrophilic Leak SealingPipeline & Liquid Storage
January 8, 2025

What Type of Pipeline Rehabilitation Do You Need?

Pipelines are a vital part of infrastructure, ensuring the safe and efficient transportation of water, gas, oil and other essential resources. However, as pipelines age,…
Reinforcing Structures: Top Techniques for Maximum DurabilityBlogBridge Strengthening and RepairsCarbon Fibre StrengtheningCCUK NewsConcrete Repairs & Specialist Work DivisionStructural Strengthening Division
January 8, 2025

Reinforcing Structures: Top Techniques for Maximum Durability

With ageing buildings, bridges and other structures facing increasing pressure from environmental conditions and everyday use, innovative reinforcement techniques are essential. Here at Composites Construction…
The Benefits of Using CCUK's Design ToolBlogCarbon Fibre StrengtheningCCUK NewsStructural Rehabilitation and RepairStructural Strengthening Division
December 16, 2024

The Benefits of Using CCUK’s Design Tool

For engineers, contractors and construction professionals, time is always of the essence. When it comes to structural reinforcement and design, certain factors can make all…