CARBON FIBRE STRENGTHENING

Duration:

3 Months

Wolverhampton Tower Blocks
Wolverhampton Tower Blocks

Project Details

Scope of Work: Working on behalf of some large contractors and very closely with Wolverhampton Council, CCUK has designed Carbon Fibre Strengthening solutions to enable the refurbishment of the HRRB’s for electrical, mechanical and sprinkler installation.

CCUK is currently carrying out carbon fibre design and installation on 7 different projects on the £100 million pound development including Heath Town Estate, phase one of the works is expected to take 3 months.

The Challenge

The new services that need to be installed in the high-rise residential blocks mostly travel through the communal areas (landings and corridors) and these spaces are very limited in terms of space and ceiling height. As the floor slabs need to have riser holes cut through them, the original structural design of the building is compromised as reinforcement is lost. Coupled with working in a live building and in very small spaces traditional strengthening measures would be even more problematic.

The Solution

CCUK’s expert composite design team, working closely and in conjunction with the councils’ structural engineering team designed an effective carbon fibre strengthening system to transfer forces and provide the stability required due to the cutting of existing reinforcement in the building.

The solution result is a very quick and effective carbon fibre wrap solution, designed to be installed around the cores prior to cutting, also the innovative use of the patented ‘Tyfo Fibre Anchor System’ for providing additional anchorage in such tight spaces.

Our team of fully trained installers have carried out the removal of existing floor screeds, temporary works, installation of the composite strengthening system and replacement of the screed. All safety measures have been kept within CCUK’s remit to ensure the safest possible environment for the tenants still living in the buildings.

The Result

Carbon fibre wrap systems are extremely strong, light and thin. Working in very tight spaces and with restricted head height meant that using these 1mm thick strengthening systems was the most innovative construction method possible. Within one particular building 22 storeys were strengthened in just 3 days, at a maximum 3mm thick overall no loss of coverage with the screeds and head height makes these systems perfect for such projects.

Tyfo fire protection systems have been used as a fire protection coating for the carbon fibre strengthening system on the soffits.

Download our Project Insider
Download Here >
Wolverhampton Tower Blocks
Cost-Effective Bridge and Building Repairs: Why Carbon Fibre is the Smart ChoiceBlogBridge Strengthening and RepairsCarbon Fibre StrengtheningStructural Rehabilitation and Repair
March 18, 2025

Cost-Effective Bridge and Building Repairs: Why Carbon Fibre is the Smart Choice

When it comes to repairing and strengthening bridges and buildings, finding solutions that are durable, efficient and cost-effective is key. One material that has become…
How Carbon Fibre Strengthening Extends the Life of Ageing InfrastructureBlogBridge Strengthening and RepairsCarbon Fibre StrengtheningConcrete Repairs & Specialist Work DivisionStructural Rehabilitation and Repair
March 14, 2025

How Carbon Fibre Strengthening Extends the Life of Ageing Infrastructure

The UK has a lot of ageing infrastructure, ranging from buildings and bridges to commercial spaces and industrial facilities. Multiple factors have caused these structures…
The Future of Structural Reinforcement: How Carbon Fibre Strengthening is Revolutionising ConstructionBlogCarbon Fibre StrengtheningStructural Rehabilitation and RepairStructural Strengthening Division
February 24, 2025

The Future of Structural Reinforcement: How Carbon Fibre Strengthening is Revolutionising Construction

The construction industry is constantly evolving, with new materials and techniques pushing the boundaries of what’s possible in structural reinforcement. One of the most significant…